Fill in the information below:  
 
Cost Per MSI    
Press Overhead/Hour    
Web Width (Inches)    
Average Press Speed FPM  
Material in Press (Feet)    
Material Used to Register (Feet)  
Press Starts per Shift    
Shifts per Day    
 
Daily Material Savings  
 
Feet    
Cost    
 
Daily Overhead Savings  
 
Time/Minutes    
Cost    
 
Sumary Overview   6 Months 12 Months 18 Months  
 
Material Saving Feet    
Number of 5000' Rolls Gained  
Material Saving Dollars    
 
Number of Hours Saved    
Number of Shifts Gained    
Overhead Savings    
 
Material + Overhead Savings